(Attachment D)
Assumptions Standard Information for UGA Architect
Projects:
Inside Cable Plant:
*There
should 1IDF per floor, if cable pulls are over 250 ft.
additional IDF may be needed.
If yes, in what area will wireless be needed? __________________________________________
give us the number of floors/wings:
___________________
__________________________________________
Outside Cable Plant:
connection been identified and if so where is the location.*___________________________________
How many feet of Conduit_____________________
* Preliminary site drawing should help you clarify location.
General Information: (Any other information you think we need to be aware of?) ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Please let us know if we can clarify any information for you about the above assumptions standard information for EITS estimates.
Thanks
Steve Carroll
542-3114