(Attachment E) EXAMPLE
November
13, 2002
To: John Doe
UGA
Architect
From: Steve Carroll,
Project Director
CC: Mike
Dennis
Associate
Director of Engineering Services
Subject: Estimate for the Coverdale Research Facility
The following are the cost estimates for the Network
Infrastructure (Data, Telephone and Cable TV) for the Coverdale Research
Facility based on the following assumptions:
Assumptions:
· There will be 1 MDF and 6 IDF's needed.
· The building is about 135,000 sq. ft. in a u-shape building.
· We need 1200 Data and 400 Voice.
· We need 1800 ft of 24 sm/24 mm fiber feed that will cover the data, voice and cable TV to the building.
· The conduit and hand holes are being covered by D. W. Brooks Green Space Budget.
· Terminate the 1200 data drops, 400 voice drops at both ends, install 4 Chatsworth Racks (19" by 7'), supply patch cables in each MDF/IDF and test each cable drop.
· The telephone equipment is being handled by Judy Howell.
Based on the above
assumptions the budgetary estimated cost is as follows:
Total cost xxxxxx
Please let me know if we need to discuss the assumptions and make any adjustments to the above estimate.
Thanks
Steve